99 Residence, KL North

From

RM 387,000

PROJECT OVERVIEW

Leasehold I Completion : 2023

Residential development located right beside the MRR2 and Jln Kuching, Tmn Wahyu. Affordable luxury homes for the public, designed to cater for own stay.

Type : 

Serviced Residence

Location : 

Taman Wahyu, KL

Tenure : 

Leasehold

Title : 

Commercial under HDA

Completion : 

2023

Land Size : 

na

Built Up / Land Area : 

900sq ft-1380 sq ft

No. Of Units : 

1421

No. Of Storey : 

55

No. Of Tower : 

4

Maintenance Fee : 

RM0.28 psf

Developer : 

JLL Group

LAYOUT

  • 3 rooms, 2 baths (900 sq. ft. Type A)

  • 3+1 rooms, 2 baths (1,080 sq. ft. Type B/B1)

  • 3+1 rooms, 3 baths (1,220 sq. ft. Type C/C1)

  • 4+1 rooms, 3 baths (1,380 sq. ft. Type D)

FLOOR PLAN

CONNECTIVITY & AMENITIES

99 Residence is strategically located beside the Middle Ring Road 2 (MRR2), and Jalan Kuching. It is also about 11km away from the KL City Centre (KLCC). Residents get to enjoy views of Batu Caves and the KLCC.

  • Duta–Ulu Klang Expressway 1 & 2 (DUKE 1 & 2)

  • Middle Ring Road 2 (MRR2)

  • Kuala Lumpur–Kuala Selangor Expressway (LATAR)

  • Jalan Kuching

  • Exclusive access from MRR2

  • Taman Wahyu KTM station

  • Batu Caves KTM station

  • Seri Delima MRT station (scheduled to be completed in 2021)

LOCATION MAP

Taman Wahyu, KL

PHOTO GALLERY

press to zoom

press to zoom

press to zoom

press to zoom
1/10

SITE PROGRESS

1/0

FEATURES & PACKAGES

  • 99 Residence is designed in a way where the door-to-door units are not facing each other. This was done to give privacy to the residents.

  • Each unit will have at least 3 bedrooms 2 two bathrooms, and it also comes with at least 2 side-by-side carpark bays.

  • A ramp will be built top connect MRR2 to the 7th floor of the car park. As for the entrance, there will be 3 lanes in and out, respectively.

  • Another feature that makes 99 Residence different is the private flyover access road from the Middle Ring Road 2 (MRR2). This gives residents another option when Jalan Kuching, the main access road to Taman Wahyu, is congested during peak hours. The flyover is slated for completion before the handover of 99 Residence in 3½ years.

99 Residence KL North